Tuesday, January 31, 2012
The Useful But Dangerous Liquid Nitrogen
Recently, an astrophysicist in Egypt was cooling a charged coupled device camera for the observatory's telescope. He was carrying a cryogenic storage vacuum flask of liquid nitrogen which was to contain the heat coming off of the camera. The flask exploded, giving the astrophysicist severe chest and hand cold burns from the bursting liquid nitrogen.
Liquid nitrogen transfers to nitrogen gas of a rapid ration of 1:694, which is why the substance exploded. If you pour two gallons of liquid nitrogen into any warm vacuum it suddenly and immediately evaporates into a gas in front of your eyes. The properties of the substance are very dangerous for those who are unfamiliar with the safety precautions or liquid nitrogen equipment.
The gas is used for observatory and lab work but is more commonly used in refrigeration. Foods and goods can be transported around the world with the use of cryogenic storage. Liquid nitrogen is also vital in the cryopreservation of blood, reproductive cells and other biological samples.
It's also used in low temperature medical treatment in some dermatology cases. Also, construction companies may be able to use liquid nitrogen to freeze damaged water pipes and stopping water leaks during the fixing process. In the military, liquid nitrogen is used in heat-seeking missiles to prevent sensors from getting confused by their own heat signals or by the heat form the planes that are launching them.
There are so many applications of liquid nitrogen, but you need the proper liquid nitrogen equipment to ensure that the safety of everyone is preserved.
Tuesday, January 3, 2012
We Stand By Our Products With a 100 Percent Guarantee
We offer top of the line cryogenic equipment to help you build the best cryogenic storage system on the market. PrincetonCryo.com provides industry-leading cryogenic design and engineers that are instrumental in creating the most well-renowned equipment in the world. Our engineers are experience and well trained to design and install all of our cryogenic equipment.
Because we have set a high bar for ourselves and have earned the reputation as a reliable, high-quality leader in the cryogenic industry, we know that all of our customers will have 100 percent satisfaction.
If you do not have 100 percent satisfaction, we adhere to a "No Hassle" return policy where we'll make sure your cryogenic equipment is working correctly or you'll get your money back. So if you're in the field that needs cryogenic storage equipment then look no further than PrincetonCryo.com, we guarantee you'll be satisfied.
Friday, January 2, 2009
Operation of Manual Discharge Device
The cryogenic manual discharge device works through the difference of temperature. The nozzle is bare to the atmosphere which contacts the dip tube, which links to the liquid nitrogen. The liquid boils off as the liquid nitrogen is colder than the much warmer dip tube. When the vent valve is closed and seated properly the discharge device is installed correctly. The liquid nitrogen is vigorously expelled from the nozzle because the head pressure pushes on the liquid nitrogen. The full and warm liquid nitrogen dewar will build pressure much more quicker.
Wednesday, December 31, 2008
Cryogenic Refurb Kit for Alcon Solenoid (P/N 13390992)
For cryogenic solenoid valves, Chart moved from Alcon to SMC in October 2007. In order to repair the existing valve, customers can now order a replacement SMC solenoid valve or an Alcon solenoid valve refurb kit. The new SMC valve lists at $185.00 whereas the refurb kit lists at $95.00. The plunger, plunger housing, springs, seals, and coil consists the refurb kit. The customers can fix their existing cryogenic valve without going through the hassle of disassembling the plumbing assembly with this kit.
Tuesday, December 23, 2008
Liquid Nitrogen Dewar Repair and Decontamination
When shipping a cryogenic dewar to MVE Chart for repair, the things to remember are:
1. All canisters should be taken out
2. Cork and cover must also be taken out
3. As explained by the method below, decontaminate the unit:
Chart Aluminum and MVE Dewars Procedure for Sanitizing and Decontaminating
The inner of the MVE aluminum cryogenic dewar is constructed with an aluminum that uses a fiberglass neck support. These stainless units are built completely from sheets of stainless steel. The use of any cleaning solution that does not react with aluminum or stainless is used for the sanitation method of these liquid nitrogen dewars, and in most cases a household detergent or mild soap solution is ideal. The cleaners and disinfectants that can be safely engaged in this are bleach, detergents, and mild soaps, hydrogen peroxide, chlorine/water and denatured alcohol.
Note: Any petroleum based cleaning solution should never be used. A solution by the name of EXPOR is utilized by U.S. Custom Service for incoming shipments from overseas consist of 9 parts water mixed with sodium chloride & lactic acid.
It is very important that the liquid nitrogen dewar’s inner vessel is completely cleaned with water and all cleaner remains are removed. Spraying the solution into the inner vessel is the best but agitation of the solution inside the inner is also tolerable. In the case of cryogenic vapor shippers and Double units, the cleaning mixture must be filled to its full capacity of the inner and then rinse. The cryogenic unit must be dried thoroughly before putting into service. We recommend setting vapor shipper Dewars upturned to drain and dry, but on the other hand, older vapor shipper models made before 1994 are not meant for this process. For cryogenic decontamination using 10% chlorine bleach with 90% water solution is still the best method. But, the agricultural professors at the University of Minnesota and Texas A & M have come to the conclusion that an enlarged mixture of chlorine bleach to 30% and 70% water taking into consideration some of the bovine and swine virus strains we see today and this solution will eradicate all known viruses except BSE.
In this disinfecting method, for 30 minutes swathe all inner surfaces of the liquid nitrogen dewar with the solution and then remove. With clean water rinse the decontaminated surfaces and after which remove the rinse water. Before putting into use allow the liquid nitrogen dewar to dry. This means invert the cryogenic vapor shippers and Doble unit Dewars by placing it on end to allowing drying. Note: Vapor shipper Dewars may take longer to renew to 100% capacity, though they are immediately ready after rinsing.
Monday, December 22, 2008
Cryogenic Discharge Device Transfer Hose
Now, MVE Chart sells a transfer hose which can be fitted to a liquid nitrogen freezer’s discharge device. This stainless steel transfer which comes standard with a phase separator hose, is two feet long and ¼ inch in diameter. The following part numbers should be referred for ordering purposes:
Phase Separator Size ..................................Part Number
Small ..............................................................14044143
Medium ..........................................................14044151
Monday, December 8, 2008
Question and Answer - Cryogenic Freezers and Controllers
Q: I am informed that Japan operates on a 100V supply with their West Coast on 60Hz and their East Coast on 50Hz. I tried to adjust the LN2 temperature for both cryogenic freezer probes A & B and in both cases it displayed (LN2 aborted). Next I went into the maintenance menu and discovered that LN2 was –273.1C. I rebooted the controller and found the same LN2 temperature. Please explain how this reading occurred and how to correct the problem?
A: As per our reference material, it indicates that Japanese standard is 100-110VAC, 50-60Hz. The power supply used for Japan on the unit in question and in US for domestic applications is the same. It is made to function with US domestic standard nominal of 120VAC 60Hz. The tolerance on US domestic power is +/- 10% and on the low side it would be ~108VAC. The frequency would not be an issue because the power supply uses an unregulated step down transformer further negation of frequency issue, taking power supply to consideration, the controller rectifies it to DC internally and output is AC. From their outlets, if they are really getting only 100VAC then the output from the power supply to the control would be -20VAC. This would be trivial to properly operate the controller, so this should not cause the issue that is mentioned here. If low voltage had been the issue, the controller would just shut off to a certain threshold voltage, which should be around the 20-21VAC point from the power supply to the control.
To correct this issue, you can replace the existing power supply with the new power supply which is currently use on the MDD units. It will provide the required output voltage with any input voltage from 100 to 250VAC and 50-60Hz since it built-in detector and switching device and is designed to accommodate +/-10%. The MDD power supply should operate with an input as low as 90VAC or as high as 275VAC. It has been subjected to these extremes by TUV to be eligible for use in the MDD units. If you decide to install this power supply to sort out this issue, then P/N’s required to make the swap are as follows:
11795030 POWER SUPPLY 30VDC 1.2A 1 EA.
11859030 BRACKET POWER SUPPLY JEROME CE 1 EA.
11859021 BRACKET ADAPTOR FOR JEROME PS 1 EA.
2912191 PHPNHMS 4 EA.
Thursday, December 4, 2008
Design Change for SC/3, SC8/5 and SC11/7
Design Change:
The new cork and cover design has been changed for SC/3, SC8/5 and SC11/7. A hinged base and cover has replaced slotted aluminum cover and the cork/cover is separated from the hinged lid. This shares the same cover assembly as Millennium and Doble units. The new part numbers are (Flat cork/cover 11209791), (Lid cover 5618176), (Hinge pin 5618156), (Hinged neck ring 5618166), (Cork/cover 11853674) (Notched lid for SC3/3 only 11838861) . This change has been in effect from January 2004. The old style replacement cork/covers are available till the unit stock supplies last and it may last through the reminder of 2004 but after which the cork/cover need to be replaced with the hinged lid.
Monday, November 24, 2008
Differences in HE Versions - Liquid Nitrogen Freezers
There has been some confusion about the different HE versions, these differences are outlined below.
- HE – Operates at -150°C, stainless steel turntable with pie shaped divisions
- HE+ – Same as HE except has more usable height and aluminum turntable
- HE Gen 2 – Same as HE except the turntable has rectangular divisions
- HE+ Gen 2– Same as HE Gen2 except has more usable height
- ETERNE – Operates at -190°C, aluminum turntable with pie shaped divisions
Friday, November 21, 2008
Increasing Sample Storage Temperature Above -132°C (Glass Transition Temperature of Water [GTTW]) - Part Two

Accordingly, we determined to examine this issue by incubating frozen PBMC samples at -114°C for a longer period (e.g., 48 hours) and then returning them to -150°C. Apoptosis values were considerably higher from PBMC samples held at -114°C than in PBMCs stored for the extent of the experiment at -150°C.
Wednesday, November 19, 2008
Increasing Sample Storage Temperature Above -132°C (Glass Transition Temperature of Water [GTTW]) - Part One
The vapor phase of liquid nitrogen LN2 (-150°C)is typically used to store PBMC’s. It is quite possible that Cryopreserved samples could possibly be frequently exposed to GTTW during retrieval of specimens, particularly from large active cryogenic repository collections. We have determined the rate and the degree that frozen samples will warm when removed from a liquid nitrogen freezer. A freezer rack enclosing mock samples was removed and laid on the top of an open liquid nitrogen freezer. With our computerized freezer monitoring system, we demonstrated that the mock samples' temperature had increased by between 14°C to 55°C, after just 5 minutes in this position, which equaled an average temperature of -114°C. This rise was well above the GTTW (-132°C).
Check back for more about GGTW!
Tuesday, November 18, 2008
The Dangers of Overfilling your Cryogenic Dewar - Part Two

Overfilling problems occur When LN2 liquid nitrogen contacts with the pumpout plug or body for an extensive period of time. Extreme cold temperatures cause the o-rings to contract and harden, which can cause the o-rings to temporarily lose their sealing properties. Since all manufacturers utilize the same o-ring design, this problematic scenario can occur on any liquid nitrogen dewar. The plastic cap will not stop this from happening but will lengthen the time it takes for failure to initiate. It is vital that the pumpout remains covered. Liquid nitrogen may crack the plastic cap if it is spilled on it, (a sign of improper filling), and therefore a replacement cap should be applied to the pumpout without delay. These caps are inexpensive and MVE will supply replacement pumpout caps when they are needed.
Years ago, MVE made use of a metal cap that held on to the pumpout body. Even though this kept dirt particles from distressing the o-rings, it did not alleviate pressure sufficiently and became a liability matter. For a short while, we used a hard plastic cover that relieved pressure but did not guard the plug from dirt. The design we presently use appears to be the safest and easiest method of shielding the o-rings without adding to the cost of the liquid nitrogen dewar. Although there are different styles, depending on the manufacturer, this appears to be the common design practiced throughout the industry. This filling safeguard is particularly significant on liquid nitrogen vapor shippers where the margin for failure recovery is even less. Liquid nitrogen vapor shippers are usually warm when LN2 liquid nitrogen charging is required. Because of the smaller inner volume and the additional liner to be cooled down, the initial flash off is far greater then if the liquid nitrogen dewar was cold. It is due to this fact that the liquid nitrogen vapor shippers usually require additional filling during the charging cycle. Proper filling directions are listed in the manuals provided with each MVE liquid nitrogen dewar, both liquid and vapor.
Visit Princeton CryoTech for more useful articles!
Monday, November 17, 2008
The Dangers of Overfilling your Cryogenic Dewar - Part One
Customers occasionally express concern due to a sudden vacuum loss to a liquid nitrogen dewar. Such liquid nitrogen dewars were returned and immediately checked, then revacuumed and LN2 liquid nitrogen tested. Incorrect filling procedures, such as overfilling, were the main causes of the vacuum losses. This article explains why it is very important to follow careful filling protocol. I am addressing the issue in this month's Tech Tip to help explain why overfilling liquid nitrogen dewars during the charging process is damaging to the vacuum integrity of the aluminum liquid nitrogen dewar.

The pumpout plug has two purposes. The main and most obvious purpose is to preserve the vacuum in the liquid nitrogen dewar’s annular space. Provided that a vacuum is present, the pumpout plug will remain inserted into the pumpout body. The second purpose is to perform as a pressure relief plug in the occurrence of a ruinous inner leak. A leak developing to the inner section of the liquid nitrogen dewar would allow liquid nitrogen to enter the annular space, causing the plug to fall out and relieve any pressure build up. When the liquid nitrogen evaporates into a gas and begins to expand, a pressure increase in the annular space is created. Two o-rings seal the plug to the pumpout body, and are coated with a vacuum grease film to guarantee longevity. The pumpouts are then covered with a flexible composite cap which keeps dirt and contaminates from disturbing the o-rings.
Visit Princeton CryoTech for information and products!
